SERVICES

DISPUTES

We can arrange negotiated meetings, facilitated meetings and mediations. Provide assistance with 12 month defect period/10 year implied warranty issues. Provide assistance with disputed jobs - no job too small.

INDEPENDENT INSPECTION REPORTS

We can arrange for an independent inspection report on disputed jobs by suitably qualified LBP's, expert trades, building surveyors, and engineers to assist with an outstanding issue.

Ring us today to see how we can help 027 296 6735

HOMEOWNER HOUSE INSPECTION

PRE-PURCHASE INSPECTION REPORT

We can arrange negotiated meetings, facilitated meetings and mediations. Provide assistance with 12 month defect period/10 year implied warranty issues. Provide assistance with disputed

jobs - no job too small.

PRE-SALE INSPECTION REPORT

We can arrange for an independent inspection report on disputed jobs by suitably qualified LBP's, expert trades, building surveyors, and engineers to assist with an outstanding issue.

INDEPENDENT INSPECTION REPORT

We can provide you with a detailed

pre-purchase inspection report following an inspection by a Licensed Building Practitioner (LBP) to assist with your purchase negotiations, insurance company or bank.

MAINTENANCE REPORT

We can provide you with a detailed pre-sale inspection report following an inspection by a Licensed Building Practitioner (LBP) to provide to prospective purchasers.

GROUND CLEARANCES

Ground Clearances.jpg

Do you have this problem with ground clearances?

 

Do you know that this can cause huge issues with moisture into your home?  

 

It essential that your home keeps as dry as possible.

Minimum permitted ground clearances

 

The rules for minimum clearances are set out in Building Code Acceptable Solution E1/AS1 and NZS 3604. 

 

This forms part of regular maintenance schedules to ensure ground clearances are maintained, so when landscaping or laying paths be careful of your ground clearances.

Top of concrete slab on ground – veneer cladding – above paving 100 mm

Top of concrete slab on ground – veneer cladding – above soil 150 mma

Top of concrete slab on ground – other cladding – above paving 150 mm

Top of concrete slab on ground – other cladding – above soil 225 mm

Top of timber pile above finished ground level 300 mm or 150 mm with DPC

Top of concrete pile above finished ground level150 mm with DPC

Top of foundation wall above finished ground level 225 mm

Suspended timber floor construction – bottom of cladding 200 mm

Suspended timber floor construction – underside of joists (i.e. crawlspace) 450 mm

Bottom of cladding to paving – except masonry veneer 100 mm

Bottom of cladding to unpaved ground – except masonry veneer